I apply that test to every engagement, whatever the service. The approach below has been built over more than a decade of applied field research with national governments, and refined through work with WFP, the Global Logistics Cluster and the Danish Ministry of Foreign Affairs.
Three questions in every engagement
- What change is intended?
- What will deliver it?
- How will the contribution be shown?
Localisation
A process and an outcome
The journey
Localisation as a process
Who defines the need, who takes decisions, and who holds resources and risk.
The destination
Locally led practice
National and local institutions performing their functions without dependence on external actors.
Capacity development is one route to that outcome, and it has to be designed for full transfer. The test is whether the supporting organisation could withdraw without the capacity going with it. A useful working principle is to be “as local as possible, as international as necessary” (Barbelet, 2018).
Localisation also asks international organisations to change. Moving from doing to enabling means new skills, incentives and ways of working, and that is an organisational development task in its own right. I work on both sides of that relationship.
The framework
Institutional Capacity Strengthening
The framework turns complex systems into areas where support can be targeted, sequenced and measured. It has four building blocks.
1 · Capacity Outcome Statement
The institution states whose capacity is being strengthened, which capacities, and to achieve what.
Enhanced capacity of whom to effectively achieve what as a result of strengthened capacity to do what.
2 · Ability and readiness
Before engaging, I look at ability and readiness to absorb support at three levels. This sets realistic expectations about the type and duration of engagement.
3 · Five pathways
Each pathway is broken into capacity bundles that can be assessed and prioritised.
- Policy and regulatory environment
- Institutional effectiveness and accountability
- Strategic planning and financing
- Technical and operational capacity
- Engagement of other actors
4 · Entry points and milestones
The institution chooses where to start. A standard sequence of milestones for each entry point keeps the institution in the lead and the adviser in an enabling role.
Capacity transformation
How capacity becomes permanent
Training creates capacity. Whether it lasts depends on what happens next. I plan for six phases, which in practice run in parallel.
- 1DemandLeadership recognises the need and owns the objective.
- 2CreationPeople acquire new skills.
- 3Retention and utilisationRoles, procedures and incentives are adjusted so the skills are used.
- 4AvailabilityEnough people hold the skills to cover turnover and growth.
- 5ModernisationSkills and systems keep pace with new needs and technologies.
- 6InstitutionalisationThe new practice is part of how the institution normally works.
Implementation
Frameworks people can use
Corporate policies and international frameworks are usually written at headquarters level. They are implemented in country offices, ministries and local organisations, often by small teams with limited budgets and competing priorities. Much of my work sits between the two.
Distil
I identify the few decisions and steps that matter most for implementation, and set aside what adds little value at country level.
Translate
I turn them into plain-language guidance, checklists, templates and training in the formats people already work with.
Test and adapt
I pilot tools with the people who will use them, revise them, and build in room for adaptation to local context.
The measure is uptake: a framework that staff understand, apply with the resources they have, and are still using after the assignment ends.
Examples: the Institutional Capacity Strengthening framework and toolkit and the Preparedness Enabler’s Guide for the Global Logistics Cluster. Capacity development content for the Danish Strategic Sector Cooperation Guidelines, followed by an e-learning course and briefings for Sector Counsellors. A four-step typology for UNICEF that classifies country contexts so the supply chain system design approach can be adapted to each.
Measurement
Measuring growth and results
I track two things separately. Keeping the two streams apart makes contribution claims credible and keeps indicator numbers down.
Growth
The change in the institution’s own behaviours and practices. Process milestones record it as it happens, and a repeated capacity assessment shows change against the baseline.
Results
The outcomes the institution achieves because of that growth. Case studies explain how and why the change occurred.
Principles
Partnership
Equitable relationships, with power and knowledge differences acknowledged openly.
Ownership
The institution leads; consensus on approach comes before activity.
Recognition
Support builds on existing capacity assets.
Trust
Relationships matter more to long-term success than plans do.
Time
Institutional change takes commitment and patience on all sides.